Sort by AttachmentsUse SHIFT+ENTER to open the menu (new window).
Managing directorFilterTel.FilterProjects listFilter
  
Construction of Mahshahr facilities and feed and product pipelines for Part B of Bidboland 2 gas refinery
  
Mohammad Ali Ghaffarizadeh
22587022
1- Hashtroud, Zanjan, Khorramdarreh, Qazvin, Dorahan and Neizar stations
  
Saveh station
  
Saveh station
  
1- Parsian refinery
  
1- Technical inspection of 4th and 8th trunk lines
  
Ezzatollah Khajehnouri
88719615
1. Shiraz Oil and Gas University
 2. Bushehr University
  
5263964
5263203
1- Construction of Margunlar station on the 192nd km of Tabriz – Bazargan pipeline
  
1- Construction of Marand station,  100th km of Tabriz – Bazargan pipeline
  
Mohammad Ja'far Shokouhinia
88757058
1. Installation and /mechanical operation at Qazvin station, 0 km of Azarbaijan pipeline
 2. Installation and /mechanical operation/ at Khorramdarreh station, 103rd km of Qazvin – Tabriz pipeline
 3. Installation and /mechanical operation/ at Zanjan station, 221st km of Azarbaijan pipeline
 4.  
  
1- South-north geotechnical studies in Urmia
  
Transportation of 56” sour gas pipes from Safa Rolling & Pipe Co.
  
Ali Hemmati
88554623
Procurement of manpower for the 5th trunk line
  
88828492
88828942
20” gas pipeline of Sar’ein - Khalkhal (first segment as PC and second segment as EPC) and 10” gas transmission pipeline to Kolour and Hashtjin as PC
  
Ms. Roshan
88850022 - 88850056
1. Supervisor of 500,000 cu. m. pressure control station in north Ahvaz
 2. Construction of Saveh / Hamedan gas transmission pipeline, 139 km long and 48” in diameter
  
Massoud Moazzemi
22082154
1. Construction of Kalleh bridge station in Qazvin
 2. Construction of Abadeh repair yard.
  
Yahya Torabi
88066201 88066191 09127062894
1. Designing a fresh water station at the 70th km of Sarkhoun – Kerman pipeline
 2. Designing Sirjan station at the 315th km of Sarkhoun – Kerman pipeline
  
Gholamreza Eshqipour
22280166-8
1. Mechanical operations of Dehaq station
 2. Construction of canal for Kharameh – Safashahr pipeline
 3. Construction of the second phase of the 5th gas trunk line
 4. Construction of 42” Assaluyeh – Fajr gas pipeline
 5. Construction of 56” Assaluyeh – Aghajari gas pipeline
  
Bijan Sediq
88908193
Repair center for Urmia pipeline
  
Rastegari
66462930
Bijar – Takab environmental studies
  
Abbas Danehpash
2558728 - 2558729
1- Supervisor of gas liquids transmission pipeline from Kangan to Bandar Taheri which is 39 km long and 10” in diameter
  
Mohammad Mehdi Dabbagh
88761460
1. Canal construction and mechanical operations for 48” Parchin – Semnan – Shahroud pipeline
 2. Consultant of gas liquids transmission pipeline from Kangan to Bandar Taheri which is 39 km long and 10”
 3. Supervisor of Tabriz – Armenia measurement station
 4. Supervisor for 30” south-north Urmia pipeline which is 48 km long and 30” in diameter
 5. Supervisor for construction of Hamedan/ Bijar gas line, 152 km long and 40”-48” in dimeter
 6. Detailed design, preliminary design and procurement of documents
  
Fazlollah Kavianimaram

88709351-2

Management services for 4 gas compression stations of the 4th trunk line
  
Qanbari
22960117
Construction of the third segment of Mehr – Lamerd highway
  
Hatam Mehri
88775287
1. Construction of 2nd Yazd gas transmission pipeline, 176.5 km long, 40” in diameter
 2. Supervisor for construction of Hamedan/Bijar gas transmission pipeline, 152 km long, 40”-48” in diameter
  
2084666-8
1. Mechanical operations for Kangan station
 2. Construction of 3rd Saveh – Qazvin pipeline
 3. Construction of the 3rd phase of 5th trunk line
 4. Construction operations for 56” booster of Qaemiyeh township - Farashband
 5. Construction of 56” loop gas pipeline of Farashband - Nourabad
 6. Hydrostatic test operations for 56” pipeline remaining of Farashband – Nourabad pipeline
  
Rahim Ja'fari
88613495-88035832
Final and workshop supervision services for 48” north – northeast pipeline
  
88506678-9
1- Basic design of Bidboland 2 A and B refinery project and EPC segment
  
Hossein Ali Hajjarizadeh
22036994-6
1- Designing operations for path finding and survey of Sudjan – Chalgard gas pipeline
  
9173245450
Cutting through mountains along Nourabad beltway
  
Hamid Mohammadi Jamali
88978347-8
Repairs center for Parsian gas pipeline
  
Massoud Baradaran Javadi
88554941
88554841
Construction of Saveh/Hamedan gas pipeline
  
Administrative building and parking lot for Sarkhoun gas refinery
  
Seyed Mohsen Hosseini
22590640
1. Civil and mechanical engineering operations for Dorhan station
 2. Design and commodity procurement services for 11 stations
 3. Discharge and transport of 50 turbo-compressors
 4. Design and commodity procurement for gas compression stations of 5th gas trunk line
  
Ali Akbar Adib Haji Baqeri
88892300 88801716
Construction of 42” Meiamei – Dasht Shaad pipeline
  
Alireza Bayat
88458347-88458287
1- Supervisor for construction of 30” Bijar – Dehgalan gas transmission pipeline; 67 km long, 30”
 Engineering, path finding, environmental assessment, survey, soil studies, detailed design, and technical services for gas transmission line and pressure reduction station No. 2 of Khorramabad (CGS)
  
Tahmasb Razavi
Varnam Khavasi
88048082
Construction of Mahshahr installations as well as feed and product pipelines for Section B of Bidboland 2 refinery
 Construction of 48” north – northeast and Parchin – Semnan gas pipeline
  
Massoud Hosseinzadeh
8746760-2
Persian Gulf University of Gas and Petrochemical Industries
  
Jalil Golnabi
88023877
88024096
Engineering and design services for cultural and recreational buildings affiliated to Persian Gulf University of Gas and Petrochemical Industries
  
Mr. Rohani
88829171 - 88824744
Environmental services for Ahvaz – Abadan – Khorramshahr pipeline
  
0231-3341501
Shahroud – Sangbast pipeline
  
Akbar Qanbari
88977285
North-northeast 48” gas pipeline crossing Shahroud – Sabzevar – Sangbast
  
0611
3393060-3
1. Construction of 8th trunk line from Parsian to Jahrom
 2. Shahroud – Sangbast gas pipeline
  
Shahroud – Sangbast pipeline
  
Transportation of surplus pipes from Imam Khomeini Port and Mahshahr pipe coating workshop to warehouses of 2nd Mahshahr pipeline
  
Nader Ataei
88052850
1- Construction of Bidboland 2 refinery, Section A
  
Reza Rahmani Seifi
88769130
Qareh Ziaoddin pipeline repairs center
  
Vahid Reza Qasemi
4070093- 4095986
1. Taking satellite images of Miyandoab – Shahindezh and Bijar – Takab gas pipelines
 2. Numerical path finding as part of preliminary geotechnical and geological studies
 3. Controlling phases 1 and 2 of 5th trunk line
  
Hendi
88752622-6
Engineering services for studies on development and reconstruction plan of Bandar Taheri facilities
  
Dr. Gotmiri
22582085 22555871
Geotechnical studies and materials resistance test for increasing resistance of the 5th building of Gas Engineering and Development Co.
  
Saeed Salehi Lorestan
88826624
88828944
Cartography for the second phase of 5th gas trunk line
  
Leveling and landscaping of warehouses related to 2nd Mahshahr pipeline
 Manufacturing sand pipe racks at warehouses related to 2nd Mahshahr pipeline
  
Quality control services for welding operations and interpretation of radiographic films
  
Mahmoud Gomroki
88801775
88908298
Construction of 48” Semnan/ Shahroud pipeline
  
88005475
88005476
Cartography  for 1st phase of 5th trunk line
  
Reza Tabatabaei
22054912
1. Construction of Assaluyeh – Aghajari pipeline; 478 km long, 56”
 2. Construction of Assaluyeh – Fajr refinery pipeline; 62.16 km long, 42”-56”
 3. Supervisor of Takab – Shahindezh pipeline; 76 km, 44”
 4. Engineering services for the 5th trunk line
  
Mohammad Mehdi Amini
8032138
88048653
Environmental services for Kangan – Bandar Taheri pipeline
 
 
  
Ja'far Shakeri
Mir-Aboutaleb Komaei-Moqaddam
88506731-2
Pedology  for 5th trunk line
  
Karamali Naderi
8912304-6
6th Saveh – Tehran 48” gas pipeline
  
Mohammad Hassan Shabak
88872491-2
1. Designing Marand station at the 100th km of Tabriz – Bazargan pipeline
 2. Designing Margunlar station at the 192nd km of Tabriz – Bazargan pipeline
  
Soheil Sha’bani
88739924
88733109
1. Supervisor for Takab – Shahindezh pipeline; 76 km, 43”
 2. Supervision over pipeline engineering operations and providing construction maps for Parsian EPC project
 3. Preparing tender bid papers for Parsian C refinery
 4. Construction of Section A of Bidboland 2 refinery
  
Alireza Sadrabadi
22590865-22575569
1- MC services for 6th trunk line over 504 km with a diameter of 56”
  
09131190621
4443953 semnan
Construction of the rest of 48” Parchin – Shahroud – Sangbast pipeline
  
1. Construction of 6th trunk line ; 504 km, 56”
 2. Construction of Hamedan – Bijar gas pipeline; 152 km, 40”-48”
 3. Design of Shahid Mohammadi station, 25 km southeast of Ahvaz
 4. Design of Shahid Mostafavi station, on the 75th km of Ahvaz – Mahshahr road
  
Nosratollah Ebrahimi
88060656
Design, procurement, and construction of telecommunication system for 5th gas trunk line (SCADA)
  
Teimur Honarbakhsh
88792263 - 88737989 - 88737924
1- Measurement station for Turkey export pipeline
  
8821100
1- Construction of Farashband, Dehaq, Neizar, and Zanjan stations
  
88042714-8
Construction of 3rd segment of 8th trunk line from Abarkouh to Naein
  
88952298
  
Abdolreza Karami
88055861-2
1. Supervision over Ahvaz – Khorramshahr – Abadan pipeline; 126 km, 30”-36”
 2. Supervisor of Tabriz – Armenia pipeline construction operations over 111 km with a diameter of 36”
  
1- Provision of technical and non-technical services for the 4th and 8th pipeline
  
Fazlollah Seyedeh Imani
22259022
22257952
Boukan pipeline repairs center
  
Designing DATE network of Parsian refinery
  
Siamak Yousefi
88870840-1
6th gas trunk line
  
Mehdi Rafati Oskuei
88822421
Mechanical operations for Pataveh, Marand, and Hashtroud stations
  
Telecommunication facilities for 3rd Azarbaijan pipeline
  
Mostafa Naddaf
88505423
88750587
Shiraz Oil and Gas University
  
Houshang Dastgiri
88713916 88100346 88722273
1. Supervisor of Bijar – Takab and Shahindezh – Miyandoab pipelines; 122 km, 30”-40”
 2. Consultant for Takab – Shahindezh pipeline; 76 km, 41”
 3. Supervisor for construction of Saveh – Hamedan gas pipeline; 139 km, 50”
  
Abolqasem Sheikholeslami
8889118-88895536 88910775
Changing location of 2nd Nourabad pipeline over 17 km
  
88010787-88021256
Final and workshop supervision over third segment of Mehr – Lamerd project
  
Massoud Kiani
88750190
1. Mechanical operations for Farashband – Sirjan station
 2. Mechanical operations for Sirjan station
  
Mostafa Sharifi
88960456
88960443
Radiographic film interpretation services
  
88755014
  
22018859-22018858
Preparing a path for Komarej – Kenartakhteh – Khesht gas pipeline
  
Seyed Mohammad Javad Taheri
88516744
88518231
Workshop supervision over telecommunication services of 4th gas trunk line
  
Construction of transmission line and gas compression stations in Khormoj, Zargari, Ab Pakhsh, and Zoudaki
  
Yahya Goudarzi
09125333373
22066923
Preparing remaining path for 48” north – northeast gas pipeline
  
Qavam Bashash
88746562
88764549
Construction of the 1st phase of 5th trunk line and 20” pipeline to Kangan
  
Abolfazl Sepehrimanesh
88803363
88703362
1. Consultant for Takab – Shahindezh gas pipeline; 76 km, 42”
 2. Environmental services along the path of the fifth trunk line
  
Ahmad Shakouri-Rad
88407672
Project management services for the 5th gas trunk line
  
88085700-9
1. Mechanical operations for Baba Meidan – Pataveh gas pipeline
 2. Preparing a path for a 56” pipeline along the 2nd and 3rd trunk lines
  
8870691-4
Construction operations for Arak station
  
Bahram Mansouri Dara
88959473 88959874
Building mosque at Towhid Jam township and development of Towhid township’s cultural complex
  
Power supply operations to cathodic protection station at 128 + 19 km of Assaluyeh – Fajr pipeline
  
88844759
88835084
Repairs center for Jahrom gas pipeline
  
88097618 - 88091901
1- Designing fuel supply facility of Lamerd airport of Parsian refinery
  
Buying handles for nabs//stop cocks// of ground valves
  
Ziaoddin Ahmadi
88822607 88828769
Preparing path for 5th gas trunk line, phase 1, segment 1
  
Mohammad Taqi Soleimani Ashtiani
88736959
  
Ali Abolhelm
  
Mehdi Rostami
88955614-9
  
Fiberoptic operations from Isfahan to Rey
  
Mohammad Sardarnia
26212812
 Sales and Bituseal insulation operations for gas pipeline
  
۸۸۰۲۰۳۳۰ 88020517
  
88792200
1- Crossing gas pipeline through Karoun River
  
88927653-4
1- Construction of 2nd Yazd pipeline over 176.5 km with a diameter of 41” in addition to environmental studies
  
South – north survey services  for Urmia
  
Mohammad Kianfar
2221071-9
Designing water supply network to Parsian refinery
  
88864878
  
Abbas Fariborz Mazare’ei
88799771
  
Ali Rahnama
22211897
  
Construction of multipurpose amphitheater of cultural complex and internal decoration (Jam)
  
Nasrollah Montazeri
88757131
  
88054782
1- Construction of telecommunications system for the 4th trunk line
  
Ab Shirin and Sirjan stations
  
Sirous Ardeshirian
22231620-4
1. Designing non-industrial buildings and detailed review of papers for Bidboland 2 refinery EPC project
 1- Supervisor for construction of Miyandoab – Naqadeh – Urmia gas pipeline over 132 km with a diameter of 30”
 2- Supervision over good implementation and other projects related to Parsian refinery EPC project
  
Shi’e Beigi
88607640
  
Rokni
88886639
  
Khansari
88007741
  
Alireza Mahdavi
8837829-32
1- Mechanical operations for Kalleh bridge
  
Abbas Sayyahzadeh
66400583
66466017
Survey operations for the 3rd phase of 5th gas trunk line
  
88518782
۸۸۵۱۲۲۰۲ 88512322
1. Consultant and supervisor for Bijan – Takab and Shahindezh – Miyandoab pipelines; 122 km, 30” & 40”
 2. Consultant for Takab – Shahindezh gas pipeline; 76 km, 40”
 3. Supervisor for construction of Saveh – Hamedan gas pipeline; 139 km, 48”
  
Mohammad Roudgari
88769031
1. Mehr – Lamerd highway
 2. Workshop supervision over 8th trunk line between Parsian and Safashahr
  
  
  
  
Hossain Rahnama
88264018 (10 Line)
- نظارت عالیه و کارگاهی چهار ایستگاه خط سراسری چهارم ( ایستگاههای 5 الی 8 )
 - طراحی تفصیلی ، نظارت عالیه و کارگاهی ایستگاه تقویت فشار گاز آغاجاری
 - طراحی تفصیلی و ارائه سرویسهای مهندسی خرید ایستگاه اضطراری تکاب
 - طراحی پایه ، تهیه اسناد مناقصه EPC ، مطالعات ژئوتکنیک و نقشه برداری ، نظارت عالیه و کارگاهی پنج ایستگاه خط هشتم سراسری