Project name
Goal
Name of contractor
Capacity (m cu. m./d)
Location
Beginning date for construction operations
Date of commissioning
Date of completion / on schedule
Sweetening units (unit)
Nominal capacity of each sweetening unit (m cu. M./d)
Ingoing H2S gas (PPMV) (design)
Outgoing H2S gas (mg/standard cu. m.) (design)
Incoming CO2 gas (design)
Outgoing CO2 gas (design)
Treatment liquid
Gas supply source
Sulfur production units
Design capacity for every sulfur unit (tons)
Gas liquids stabilizing units (No.)
Input gas separation units )unit(
Design capacity for every gas separation unit (m cu. m. /d)
Input gas separation units (No.)
Design capacity for every gas separation unit (m cu. m. /d):
LPG production units (unit)
Design capacity for every LPG production unit (tons per year)
Dehumidification units (unit)
Design capacity for every dehumidification unit (m cu. m./d)
Chilling and dew point control units (unit)
Design capacity for every chilling and dew point control unit (m cu. m./d)
Drying liquid
Amount of outgoing H2O gas (design) (LB/SCF)
Propane compressor (machine)
Capacity of every propane compressor (kw)
Instrument air compressors (No.)
Capacity of air compressors
Firefighting pumps
Capacity of every firefighting pump
Outgoing pressure of every firefighting pump (BARG)
Type of gas measurement stations (early design)
Number of measurement stations (qty.)
Amount of sour gas received (b cu. m./y)
Amount of sweet gas received (b cu. m./y)
Gas sent to pipelines (b cu. m./y)
Amount of power consumed by refinery (MW)
Refinery gas fuel (m cu. m./y)
Hydrocarbons heavier than ethane gas
Boilers (tons per hour)
Design capacity for every boiler (tons per hour)
Number of generators (unit)
Capacity of every generator (MW)
ضمايم