| 22587022 |
1- Hashtroud, Zanjan, Khorramdarreh, Qazvin, Dorahan and Neizar stations
| | |
1- Technical inspection of 4th and 8th trunk lines
| | 88719615 |
1. Shiraz Oil and Gas University
2. Bushehr University
| | 88757058 |
1. Installation and /mechanical operation at Qazvin station, 0 km of Azarbaijan pipeline
2. Installation and /mechanical operation/ at Khorramdarreh station, 103rd km of Qazvin – Tabriz pipeline
3. Installation and /mechanical operation/ at Zanjan station, 221st km of Azarbaijan pipeline
4.
| | |
1- South-north geotechnical studies in Urmia
| | 88850022 - 88850056 | 1. Supervisor of 500,000 cu. m. pressure control station in north Ahvaz
2. Construction of Saveh / Hamedan gas transmission pipeline, 139 km long and 48” in diameter | | 66462930 |
Bijar – Takab environmental studies
| | 2558728 - 2558729 |
1- Supervisor of gas liquids transmission pipeline from Kangan to Bandar Taheri which is 39 km long and 10” in diameter
| | 88761460 |
1. Canal construction and mechanical operations for 48” Parchin – Semnan – Shahroud pipeline
2. Consultant of gas liquids transmission pipeline from Kangan to Bandar Taheri which is 39 km long and 10”
3. Supervisor of Tabriz – Armenia measurement station
4. Supervisor for 30” south-north Urmia pipeline which is 48 km long and 30” in diameter
5. Supervisor for construction of Hamedan/ Bijar gas line, 152 km long and 40”-48” in dimeter
6. Detailed design, preliminary design and procurement of documents
| | | Management services for 4 gas compression stations of the 4th trunk line | | 88775287 |
1. Construction of 2nd Yazd gas transmission pipeline, 176.5 km long, 40” in diameter
2. Supervisor for construction of Hamedan/Bijar gas transmission pipeline, 152 km long, 40”-48” in diameter
| | 88613495-88035832 |
Final and workshop supervision services for 48” north – northeast pipeline
| | 88506678-9 |
1- Basic design of Bidboland 2 A and B refinery project and EPC segment
| | 22036994-6 |
1- Designing operations for path finding and survey of Sudjan – Chalgard gas pipeline
| | 88458347-88458287 |
1- Supervisor for construction of 30” Bijar – Dehgalan gas transmission pipeline; 67 km long, 30”
Engineering, path finding, environmental assessment, survey, soil studies, detailed design, and technical services for gas transmission line and pressure reduction station No. 2 of Khorramabad (CGS)
| | 88829171 - 88824744 | Environmental services for Ahvaz – Abadan – Khorramshahr pipeline | | 4070093- 4095986 |
1. Taking satellite images of Miyandoab – Shahindezh and Bijar – Takab gas pipelines
2. Numerical path finding as part of preliminary geotechnical and geological studies
3. Controlling phases 1 and 2 of 5th trunk line
| | 22054912 |
1. Construction of Assaluyeh – Aghajari pipeline; 478 km long, 56”
2. Construction of Assaluyeh – Fajr refinery pipeline; 62.16 km long, 42”-56”
3. Supervisor of Takab – Shahindezh pipeline; 76 km, 44”
4. Engineering services for the 5th trunk line
| | 8032138 88048653 |
Environmental services for Kangan – Bandar Taheri pipeline
| | 88872491-2 | 1. Designing Marand station at the 100th km of Tabriz – Bazargan pipeline
2. Designing Margunlar station at the 192nd km of Tabriz – Bazargan pipeline | | 88739924 88733109 |
1. Supervisor for Takab – Shahindezh pipeline; 76 km, 43”
2. Supervision over pipeline engineering operations and providing construction maps for Parsian EPC project
3. Preparing tender bid papers for Parsian C refinery
4. Construction of Section A of Bidboland 2 refinery
| | 22590865-22575569 |
1- MC services for 6th trunk line over 504 km with a diameter of 56”
| | |
1. Construction of 6th trunk line ; 504 km, 56”
2. Construction of Hamedan – Bijar gas pipeline; 152 km, 40”-48”
3. Design of Shahid Mohammadi station, 25 km southeast of Ahvaz
4. Design of Shahid Mostafavi station, on the 75th km of Ahvaz – Mahshahr road
| | 88792263 - 88737989 - 88737924 | 1- Measurement station for Turkey export pipeline | | 88055861-2 |
1. Supervision over Ahvaz – Khorramshahr – Abadan pipeline; 126 km, 30”-36”
2. Supervisor of Tabriz – Armenia pipeline construction operations over 111 km with a diameter of 36”
| | |
1- Provision of technical and non-technical services for the 4th and 8th pipeline
| | |
Designing DATE network of Parsian refinery
| | 88870840-1 | | | 88516744 88518231 |
Workshop supervision over telecommunication services of 4th gas trunk line
| | |
Construction of transmission line and gas compression stations in Khormoj, Zargari, Ab Pakhsh, and Zoudaki
|
|
Follow
javascript: SP.SOD.executeFunc('followingcommon.js', 'FollowDoc', function() { FollowDoc('{ListId}', {ItemId}); });
0x0
0x0
ContentType
0x01
1100
Edit in Dashboard Designer
/_layouts/15/images/ppsEditDesigner.png?rev=40
/EN/_layouts/15/ppswebparts/DesignerRedirect.aspx?Operation=OpenItem&ItemLocation={ItemUrl}
0x0
0x0
ContentType
0x0101004C06BE72B56941358D9BD0B31603EC4D
230
Edit in Dashboard Designer
/_layouts/15/images/PPSSiteTemplateRun.png?rev=40
{SiteUrl}/_layouts/15/ppswebparts/DesignerRedirect.aspx?Operation=OpenItem&ItemLocation={ItemUrl}&ItemType=Dashboard
0x0
0x0
ContentType
0x01002DDC53CB1D5F4520BE0568558051291F06
230
Edit in Dashboard Designer
/_layouts/15/images/PPSSiteTemplateRun.png?rev=40
{SiteUrl}/_layouts/15/ppswebparts/DesignerRedirect.aspx?Operation=OpenItem&ItemLocation={ItemUrl}&ItemType=Filter
0x0
0x0
ContentType
0x01002DDC53CB1D5F4520BE0568558051291F05
230
Edit in Dashboard Designer
/_layouts/15/images/PPSSiteTemplateRun.png?rev=40
{SiteUrl}/_layouts/15/ppswebparts/DesignerRedirect.aspx?Operation=OpenItem&ItemLocation={ItemUrl}&ItemType=Indicator
0x0
0x0
ContentType
0x01002DDC53CB1D5F4520BE0568558051291F03
230
Edit in Dashboard Designer
/_layouts/15/images/PPSSiteTemplateRun.png?rev=40
{SiteUrl}/_layouts/15/ppswebparts/DesignerRedirect.aspx?Operation=OpenItem&ItemLocation={ItemUrl}&ItemType=Kpi
0x0
0x0
ContentType
0x01002DDC53CB1D5F4520BE0568558051291F01
230
Display Report
/_layouts/15/images/PPSSiteTemplateRun.png?rev=40
javascript:window.open('{SiteUrl}/_layouts/15/ppswebparts/ReportViewPreview.aspx?SiteLocation={SiteUrl}&ItemLocation={ItemUrl}')
0x0
0x0
ContentType
0x01002DDC53CB1D5F4520BE0568558051291F04
231
Edit in Dashboard Designer
/_layouts/15/images/ppsEditDesigner.png?rev=40
{SiteUrl}/_layouts/15/ppswebparts/DesignerRedirect.aspx?Operation=OpenItem&ItemLocation={ItemUrl}&ItemType=ReportView
0x0
0x0
ContentType
0x01002DDC53CB1D5F4520BE0568558051291F04
230
Display Scorecard
/_layouts/15/images/PPSSiteTemplateRun.png?rev=40
javascript:window.open('{SiteUrl}/_layouts/15/ppswebparts/ScorecardPreview.aspx?SiteLocation={SiteUrl}&ItemLocation={ItemUrl}')
0x0
0x0
ContentType
0x01002DDC53CB1D5F4520BE0568558051291F02
231
Edit in Dashboard Designer
/_layouts/15/images/ppsEditDesigner.png?rev=40
{SiteUrl}/_layouts/15/ppswebparts/DesignerRedirect.aspx?Operation=OpenItem&ItemLocation={ItemUrl}&ItemType=Scorecard
0x0
0x0
ContentType
0x01002DDC53CB1D5F4520BE0568558051291F02
230
Compliance Details
javascript:if (typeof CalloutManager !== 'undefined' && Boolean(CalloutManager) && Boolean(CalloutManager.closeAll)) CalloutManager.closeAll(); commonShowModalDialog('{SiteUrl}'+
'/_layouts/15/itemexpiration.aspx'
+'?ID={ItemId}&List={ListId}', 'center:1;dialogHeight:500px;dialogWidth:500px;resizable:yes;status:no;location:no;menubar:no;help:no', function GotoPageAfterClose(pageid){if(pageid == 'hold') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+
'/_layouts/15/hold.aspx'
+'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'audit') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+
'/_layouts/15/Reporting.aspx'
+'?Category=Auditing&backtype=item&ID={ItemId}&List={ListId}'); return false;} if(pageid == 'config') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+
'/_layouts/15/expirationconfig.aspx'
+'?ID={ItemId}&List={ListId}'); return false;}}, null);
0x0
0x1
ContentType
0x01
898
Document Set Version History
/_layouts/15/images/versions.gif?rev=40
javascript:SP.UI.ModalDialog.ShowPopupDialog('{SiteUrl}'+
'/_layouts/15/DocSetVersions.aspx'
+ '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
330
Send To other location
/_layouts/15/images/sendOtherLoc.gif?rev=40
javascript:GoToPage('{SiteUrl}' +
'/_layouts/15/docsetsend.aspx'
+ '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
350