Tel.FilterProjects listFilter
  
Construction of Mahshahr facilities and feed and product pipelines for Part B of Bidboland 2 gas refinery
  
Saveh station
  
Saveh station
  
1- Parsian refinery
  
5263964
5263203
1- Construction of Margunlar station on the 192nd km of Tabriz – Bazargan pipeline
  
1- Construction of Marand station,  100th km of Tabriz – Bazargan pipeline
  
Transportation of 56” sour gas pipes from Safa Rolling & Pipe Co.
  
88554623
Procurement of manpower for the 5th trunk line
  
88828492
88828942
20” gas pipeline of Sar’ein - Khalkhal (first segment as PC and second segment as EPC) and 10” gas transmission pipeline to Kolour and Hashtjin as PC
  
22082154
1. Construction of Kalleh bridge station in Qazvin
 2. Construction of Abadeh repair yard.
  
88066201 88066191 09127062894
1. Designing a fresh water station at the 70th km of Sarkhoun – Kerman pipeline
 2. Designing Sirjan station at the 315th km of Sarkhoun – Kerman pipeline
  
22280166-8
1. Mechanical operations of Dehaq station
 2. Construction of canal for Kharameh – Safashahr pipeline
 3. Construction of the second phase of the 5th gas trunk line
 4. Construction of 42” Assaluyeh – Fajr gas pipeline
 5. Construction of 56” Assaluyeh – Aghajari gas pipeline
  
88908193
Repair center for Urmia pipeline
  
22960117
Construction of the third segment of Mehr – Lamerd highway
  
2084666-8
1. Mechanical operations for Kangan station
 2. Construction of 3rd Saveh – Qazvin pipeline
 3. Construction of the 3rd phase of 5th trunk line
 4. Construction operations for 56” booster of Qaemiyeh township - Farashband
 5. Construction of 56” loop gas pipeline of Farashband - Nourabad
 6. Hydrostatic test operations for 56” pipeline remaining of Farashband – Nourabad pipeline
  
9173245450
Cutting through mountains along Nourabad beltway
  
88978347-8
Repairs center for Parsian gas pipeline
  
88554941
88554841
Construction of Saveh/Hamedan gas pipeline
  
Administrative building and parking lot for Sarkhoun gas refinery
  
22590640
1. Civil and mechanical engineering operations for Dorhan station
 2. Design and commodity procurement services for 11 stations
 3. Discharge and transport of 50 turbo-compressors
 4. Design and commodity procurement for gas compression stations of 5th gas trunk line
  
88892300 88801716
Construction of 42” Meiamei – Dasht Shaad pipeline
  
88048082
Construction of Mahshahr installations as well as feed and product pipelines for Section B of Bidboland 2 refinery
 Construction of 48” north – northeast and Parchin – Semnan gas pipeline
  
8746760-2
Persian Gulf University of Gas and Petrochemical Industries
  
88023877
88024096
Engineering and design services for cultural and recreational buildings affiliated to Persian Gulf University of Gas and Petrochemical Industries
  
0231-3341501
Shahroud – Sangbast pipeline
  
88977285
North-northeast 48” gas pipeline crossing Shahroud – Sabzevar – Sangbast
  
0611
3393060-3
1. Construction of 8th trunk line from Parsian to Jahrom
 2. Shahroud – Sangbast gas pipeline
  
Shahroud – Sangbast pipeline
  
Transportation of surplus pipes from Imam Khomeini Port and Mahshahr pipe coating workshop to warehouses of 2nd Mahshahr pipeline
  
88052850
1- Construction of Bidboland 2 refinery, Section A
1 - 30Next